Petersburg Press

Framework lifted for overhead bins

Crane lifts the support framework for load-out bins at the Helena plant.
Construction of the new fertilizer blending facility at Helena in Petersburg continued last week with installation of the steel framework that will support two overhead load-out bins. These bins, each with a capacity of about 30 tons, are scheduled for installation this week.
There are 10 fertilizer storage bins inside the building, and a leg will be installed to connect them to the overhead bins.